Office data cabling items to include
Use this checklist during design or before finalising the electrical and communications scope.
- Desk data points. Confirm whether each workstation needs one or more data points, phone points, dock connections or spare outlets for future staff changes.
- WiFi access point cabling. Plan ceiling access point locations with the IT provider so wireless coverage supports open areas, meeting rooms and shared spaces.
- Meeting rooms. Allow data cabling for displays, video conferencing, room booking panels, table boxes and wireless presentation systems where required.
- Printers and shared equipment. Do not forget printers, reception devices, payment terminals, time clocks, kitchen screens or other shared equipment.
- Security and cameras. Networked CCTV, access control and intercom devices often need data cabling or network pathways coordinated with the security system.
- Comms rack and patching. Confirm rack size, patch panel capacity, switch space, UPS allowance, ventilation and cable management before installation.
Testing and labelling matter after the install
The cabling is only useful if it can be identified, patched and supported later. Every data point should be labelled to match the patch panel and rack layout – poor labelling makes future moves, additions and fault finding harder for the IT provider.
EDN uses DSX-8000 cable testing and certification equipment to support structured cabling outcomes and documentation where required.
- Logical outlet labels
- Matching patch panel labels
- Cable test records where required
- Rack and patching organisation
Allow for the office changing after handover
A cabling design should consider staff growth, technology changes and minor office reconfigurations.
- Spare points. Spare data points reduce the need for disruptive works when staff numbers or desk layouts change.
- Spare rack capacity. Allow rack and patch panel capacity for additional switches, circuits and future cabling.
- Pathways for future works. Cable tray, ceiling access and pathways should support future additions where practical.
This guide is a general planning resource. It is not a substitute for project-specific design, site inspection or compliance review.
Frequently asked questions
Is Cat6 or Cat6A better for an office?
Should AP cabling wait for the IT provider to choose hardware?
Can EDN provide Molex Certified cabling?
Does EDN test data cabling?
Published 1 August 2026. General guidance only — every site differs. Talk to EDN about your specific project.