Office Fitout Electrical Scope Checklist

An office fitout electrical scope should cover more than power points and lights. It should consider the way the business will use the space after handover. This guide outlines the practical electrical, data, network and security items to review before an office fitout starts.

Start with how the office will actually operate

The best electrical scope starts with the furniture plan, staff count, meeting room layout, IT requirements and security requirements.

  • Workstations and desk power. Confirm workstation quantities, desk layouts, floor boxes, wall outlets, charging requirements and spare capacity before cabling is installed.
  • Meeting rooms and AV locations. Meeting rooms often need power, data, display cabling, table boxes, access point coverage and support for room technology.
  • Kitchen, breakout and utility areas. Allow for appliances, water units, printers, cleaners outlets, equipment charging and other practical support areas.
  • Lighting and switching. Review open office lighting, boardroom switching, emergency and exit lighting, sensor control and tenancy lighting changes.
  • Comms rack and network location. Confirm where the comms rack, NBN handoff, switches, patch panels, UPS and IT equipment will live before cabling routes are locked in.
  • Security and access control. Plan doors, readers, cameras, alarm devices and intercom locations early so cabling and power can be coordinated with the fitout.

Do not leave data and security until the end

Office fitouts usually involve builders, joiners, furniture suppliers, IT providers, security providers and the client. If data and security are not planned with the electrical scope, the site can end up with extra surface conduit, missing outlets or poor camera and access point locations.

EDN can review the electrical, data and security requirements together so the finished office supports the way the business actually works.

  • Furniture and workstation layout
  • Meeting room and AV requirements
  • WiFi access point locations
  • Security and access control requirements
  • Comms rack location and pathways
  • Builder handover dates and staging

What should be checked before handover

A good office fitout should be usable and maintainable after the project team leaves site.

  • Labels and documentation. Data outlets, patch panels and rack cabling should be labelled logically so the IT provider can patch and support the office.
  • Testing and certification. Data cabling should be tested and certification records supplied where required by the project scope or cabling system.
  • Client walkthrough. Review important switches, rack locations, access control points, security equipment and known limitations before practical completion.

This guide is a general planning resource. It is not a substitute for project-specific design, site inspection or compliance review.

Frequently asked questions

Should the electrical contractor also handle data cabling?
For many office fitouts it is better to coordinate electrical and data together, because desks, meeting rooms, access points and comms locations all affect each other.
When should security be planned?
Early, especially access control, CCTV and alarm cabling. Late planning can create poor device locations or extra visible cabling.
Can EDN review plans before the fitout starts?
Yes. EDN can review commercial fitout plans and help identify practical electrical, data and security requirements.

Published 26 July 2026. General guidance only — every site differs. Talk to EDN about your specific project.

Planning a Commercial Project?

Talk it through with EDN

Electrical, data, network and security infrastructure delivered through one contractor.

Book a Site Visit

    Up to three files, 8 MB each. Photos of the site, switchboard, comms rack or ceiling space help us quote accurately. iPhone HEIC photos are fine.