Warehouse fitouts need more than basic power
A warehouse tenancy usually arrives as a shell: some power, some lighting, little else. Making it operational takes a coordinated scope.
- High-bay lighting. Lighting levels and layouts that suit racking, aisles and work areas, with sensors where useful.
- Power and circuits. General power, dedicated circuits and three-phase supply for equipment.
- Equipment power. Chargers, compressors, hoists, conveyors, roller doors and dock equipment.
- Data cabling and WiFi. Network cabling, access points and coverage across racking, offices and dispatch.
- Security systems. CCTV, alarms and access control for entries, docks and high-value zones.
- Office areas. The attached office needs its own fitout scope: desks, meeting areas, kitchen and comms.
Warehouse services need to be planned around operations
Racking layouts, forklift routes, mezzanines and dock operations all affect where services can run and where equipment can mount. Cabling and lighting planned before the racking layout is final often has to be reworked.
EDN plans electrical, data and security together around the operational layout, and owns scissor lifts for efficient work at warehouse heights.
Good warehouse infrastructure supports daily work
The test of a warehouse fitout is whether daily operations run without workarounds.
- WiFi that covers the racking. Scanners and devices work everywhere, not just near the office.
- Power where equipment lives. No leads across walkways or overloaded boards.
- Cameras covering what matters. Entries, docks and key zones reviewable when needed.
- Capacity to grow. Spare circuits, rack capacity and pathways for future changes.
This guide is a general planning resource. It is not a substitute for project-specific design, site inspection or compliance review.
Frequently asked questions
Can EDN handle the full warehouse scope?
When should services be planned?
Can EDN work at height?
Does EDN support warehouse upgrades as well as fitouts?
Published 20 July 2026. General guidance only — every site differs. Talk to EDN about your specific project.
